SeaNova – between the hammer and the anvil 

09/29/2006

installing steering and control cables

Filed under: Malahini - DANGA — keith @ 19:21

I’m feeling poorly today, so I stayed home from work and played about a bit w/ the steering control cabling. Here’s a picture that shows the steering wheel on the dash as well as the power box below the starboard carling:


Here’s a picture under the engine well showing the battery box and gas tank installed:


Hopefully tomorrow I can get the engine control installed. Mike has offered to help sling the motor on the transom tomorrow if I can get things ready…

09/28/2006

finished the electrical wiring

Filed under: Malahini - DANGA — keith @ 07:49

The electrical systems are installed and I’m going to start working on the motor control systems next. Here’s a picture showing the lights and hardware installed on the foredeck as well as the stern light (see the 36″ pole in the stern?):


I’ll take some picture of the wiring panel, etc. soon…

09/13/2006

back from the upholerstery shop

Filed under: Malahini - DANGA — keith @ 14:47

OK, we’re back from holiday and Danga is back from the upholstery shop. Here’s what it looks like now:


The seats are really quite comfortable. Here’s the front bench seat:looks like now (note the step-through):


and here’s the back bench seat:looks like now:

Powered by WordPress